In response to an elevated demand for our distinctive NDT inspection companies within the North-East of Scotland, Sonomatic, a world chief specialising in Advanced and Conventional NDT Inspections, Engineering, Integrity and Rope Access companies, is asserting growth plans to supply further radiography capability inside its base at The Core, Bridge of Don, bringing the whole variety of bays accessible to 5.

Just three years in the past, Sonomatic invested in constructing a model multi-disciplined facility overlaying your entire vary of NDT Inspections, housing three radiography, one hydro testing bay and the power to carry out heat-treatment on consumer’s tools.

Now the corporate is increasing the NDT facility to deal with 5 radiography bays, two hydro bays and 4 warmth remedy machines. Sonomatic have additionally been dedicated to creating and enhancing a state-of-the-art on-line reporting system providing rapid consumer reviews, in addition to a novel service of using a full-time driver to assist purchasers with pressing assortment and deliveries.

Tracy Anderson, Sonomatic’s Regional Manager, says, “This is an thrilling time for Sonomatic and, we hope, for our purchasers. Our staff are devoted to their chosen occupation and take immense pleasure to satisfy our consumer’s wants and it’s this dedication and the belief we have now constructed with them, that has allowed us to speculate additional in Aberdeen and lengthen our workshop service space, making certain we meet all of our consumer’s capability necessities, deadlines and particularly these final minute pressing turnaround occasions!”

Sonomatic additionally supply extremely certified Phased Array Technicians, in addition to cellular NDT companies to all onshore and offshore purchasers, together with UT, Eddy Current, MPI, Liquid Penetrant, Radiography, on-site radiography (a cellular dark-room can be accessible for long term contracts) and heat-treatment.

Sonomatic have additionally been extremely profitable in our time period contract service, giving our purchasers the total advantages of working with our engineering division and our specialised Inspection divisions, offering our purchasers with options to probably the most difficult of Inspections. With all three divisions based mostly at The Core, Aberdeen, and lengthening to Grangemouth, Sonomatic supply a very distinctive service to their purchasers as they face extra opposed challenges within the NDT world.

The 24 hour a day base is because of open its 4th and fifth bays in early April, creating extra jobs which is one thing Sonomatic has been dedicated to since The Core opened, lower than three years in the past.

Tracy provides, “We’ve labored very carefully with our purchasers all through the final three years and want to thank them for his or her on-going assist and suggestions. It is that this suggestions that permits us to supply a really totally different service to that of different NDT corporations.”

“All of the advantages listed above present value efficiencies to our purchasers, constructed and supported by our unshakeable integrity and professionalism in each single service Sonomatic gives. We are there FOR the consumer each step of the way in which and can proceed to search for methods to assist them and supply revolutionary options for what generally is a very complicated market,” says Tracy.

Sonomatic has plans for a Phase three extension, which is anticipated to start on the mid to finish of 2019, constructing a match for goal portray and blasting service, offering purchasers NDT, Hydro-Testing, Heat-treatment and portray all below one roof!

Talking to Oil and Gas People a spokeswoman for Sonomatic confirmed that the corporate could be seeking to rent as much as 20 new workers between phases 2 and three of their growth. 

whats up

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here