Aker Solutions has signed a contract with Petrobras to supply a subsea manufacturing system and associated companies for the Mero 1 mission inside the Mero discipline improvement, one of many largest oil discoveries in Brazil's pre-salt space.

The subsea manufacturing system will include 12 vertical subsea timber designed for Brazil's pre-salt, 4 subsea distribution items, three topside grasp management stations for the Mero 1 Guanabara FPSO and spare elements. The order additionally contains set up and commissioning assist companies.

“We're happy to turn into a key provider to Petrobras and its companions for the primary full manufacturing mission of this main improvement,” stated Luis Araujo, CEO of Aker Solutions. “We have an in depth native workforce and over 40 years' expertise in Brazil and stay up for persevering with to play an necessary function within the improvement of the nation's pre-salt sources,” he added.

@tailor-made@

Aker Solutions' subsea manufacturing facility in São José dos Pinhais and its subsea companies base in Rio das Ostras will perform the work.

The work has already began and deliveries are scheduled for 2020. Installations are scheduled between 2020 and 2023.

The subsea manufacturing system will likely be hooked as much as the primary full-scale floating manufacturing, storage and offloading (FPSO) vessel for Mero, often known as the Guanabara FPSO. The FPSO is scheduled to come back on stream in 2021 and may have capability to course of as much as 180,000 bopd and 12 MMcmg a day.

The ultra-deepwater Mero discipline is situated within the northwestern space of the unique Libra block, which is about 180 km south of Rio de Janeiro. First oil was produced in November final yr.

Petrobras is the operator of the consortium creating the Libra space. Shell, Total, CNPC and CNOOC Limited are companions. Pre-Sal Petróleo S.A (PPSA) manages the Production Sharing Contract.

p.p1 p.p2 p.p3 span.s1 span.s2

The corporations usually are not disclosing the worth of the contract. The order will likely be booked in third-quarter 2018.

Source: www.worldoil.com

p.p1 p.p2 p.p3 p.p4 p.p5 span.s1 span.s2 span.s3

Please go away feedback and suggestions beneath

hi there

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here