The tender-assisted drilling unit EDrill-2 not too long ago accomplished the heavy lifts for erecting the DES (drilling tools set) on the Kerisi platform within the Natunas Sea for its contract with Medco Energi. The unit mobilised from Singapore on 25th March 2020, for the two+three wells contract over four platforms which is estimated to final until the tip of the yr.
The crew underneath the management of Rig Manager, Graeme Bain, and OIM, Gary Bunn, did a praiseworthy job of motivating the crew in getting the heavy lifting accomplished safely in difficult situations because of the outbreak of the COVID-19 pandemic.
The crew from Medco Energi lead by Arie Septiantoro, Manager Well Operations Offshore, can also be very skilled and co-operative all the best way from the phrase go.
“I’m very grateful and happy with the crew for getting the job accomplished underneath these aggravating situations. These aren’t any peculiar days, each side from crew change to logistics poses critical challenges and I can’t thank the crew sufficient for his or her dedication and dedication to get the job accomplished safely. We are additionally grateful for the co-operation and understanding from Medco on this tough interval.”, mentioned Marcus Chew, the CEO of Energy Drilling.
Energy Drilling, headquartered in Singapore, is an organization established to develop, construct and function the subsequent era of self-erecting tender rigs.
The tender help barge rigs, EDrill-1 and EDrill-2 have been chartered for long run growth drilling campaigns offshore within the Gulf of Thailand and within the Gulf of Mottoma, Myanmar, after their supply in 2014 from Cosco Guangdong Shipyard in China.
(Source and picture: EDrill)

The put up EDRILL-2 RIGGED UP AT KERSIRI PLATFORM IN THE NATUNA SEA appeared first on Energy Global News.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here