Tender rig specialist Energy Drilling has accomplished the heavy lifting of the drilling gear set (DES) on the Kerisi discipline platform positioned within the Natuna Sea off Indonesia.

EDrill-2 tender rig; Image: Energy Drilling

Energy Drilling mentioned on Sunday that its EDrill tender help rig had accomplished the raise on Friday, 10 April, as a part of a contract with Indonesia’s Medco Energi.

The rig mobilised from Singapore on 25 March, for the two+three wells contract over 4 platforms which is estimated to final till the top of the 12 months.

The firm added that the rig crew had accomplished the heavy lifting safely in “difficult circumstances” as a result of outbreak of the COVID-19 pandemic.

Marcus Chew, the CEO of Energy Drilling, mentioned: “These aren’t any peculiar days, each facet from crew change to logistics poses critical challenges and I can’t thank the workforce sufficient for his or her dedication and willpower to get the job carried out safely. We are additionally grateful for the co-operation and understanding from Medco on this troublesome interval”.

As for the Kerisi platform, it’s positioned on the namesake discipline in Block B within the South Natuna Sea. The discipline was found in 1990.

The put up Energy Drilling completes heavy raise for Medco in Natuna Sea appeared first on Offshore Energy.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here