A near-miss incident on the ExxonMobil-operated Hebron platform situated offshore Canada has been reported to the Canadian offshore regulator.

ExxonMobil has reported that, on 24 June 2020, on the Hebron platform, a container bumped a brief handrail, in response to a report by the C-NLOPB.

A bit of the handrail, which weighed roughly 9kg, fell roughly 20m and landed on the intervention deck beneath.

There have been no accidents and no personnel have been within the space.

However, the regulator stated that the incident had had the potential for fatality, primarily based on the Dropped Objects Prevention Scheme (DROPS) calculator.

ExxonMobil stopped all crane operations, put in onerous limitations on the handrail location, and has initiated an investigation into the foundation explanation for the incident.

The C-NLOPB is monitoring ExxonMobil’s investigation of the incident.

Discovered in 1980, the Hebron discipline is estimated to include greater than 700 million barrels of recoverable assets.

The Hebron platform consists of a stand-alone gravity-based construction, which helps an built-in topsides deck that features dwelling quarters and drilling and manufacturing amenities.

The platform has a storage capability of 1.2 million barrels of oil. The manufacturing began in November 2017.

The publish ExxonMobil investigating near-miss incident on Hebron platform appeared first on Offshore Energy.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here