Framatome was awarded a multimillion-euro contract to modernize the crane instrumentation and management (I&C) techniques on the analysis neutron supply Heinz Maier-Leibnitz (FRM II), which is operated by the Technical University of Munich. The crane techniques assist varied actions, comparable to neutron experiments, upkeep, waste remedy and gas dealing with.
This modernization venture includes dismantling current parts, commissioning 4 new cranes and implementing an automatic management system. These enhancements adjust to the protection requirements of the Nuclear Safety Standards Commission (KTA) and improve reactor security, scale back upkeep prices, maintain long-term operation and safeguard investments within the facility.
“By modernizing the crane techniques, we guarantee the longer term availability of neutrons for scientific analysis and medical and industrial functions,” stated Daniel Schneider, FRM II venture supervisor.
The modernized I&C system supplies fail-safe, redundant parts and superior cyber safety performance. This safety-related system requires an impartial overview by the TÜV Technical Inspection Association earlier than set up. The venture is scheduled for completion by the top of 2022.
FRM II was constructed by Framatome and its predecessor corporations and began operations in 2004. It is the world’s strongest and fashionable neutron supply and ensures the safety of provide for all its functions. About 1,000 worldwide visitor researchers come to FRM II every year to carry out cutting-edge analysis.
(Source: Framatome – Image: Heinz Mayer Leibniz analysis heart)

The put up FRAMATOME TO MODERNIZE SYSTEMS AT HEINZ MAIER-LEIBNIZ RESEARCH REACTOR appeared first on Energy Global News.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here