Gazprom Neft has begun growing the northern part of its Novoportovskoye subject — one of many firm’s key oil manufacturing centres within the Arctic. Implementing this mission ought to see the corporate’s Arctic asset attain peak manufacturing, at eight million tonnes of oil per 12 months, by 2021.
Recoverable reserves within the northern part stand at greater than 27.eight million tonnes of oil, and 28.5 cubic metres of gasoline.
The key problem in growing this subject lies in its remoteness from primary subject infrastructure: to which finish, the corporate is now finishing its building of the “Sever” digital substation, to make sure an power provide to the brand new subject.
Ten nicely pads — all of them comprising high-tech wells — will likely be put in to facilitate oil manufacturing within the northern a part of the Novoportovskoye subject. First oil has already been produced on the first nicely, which runs to a complete size of three,395 metres, with a 999-metre horizontal part.
A confirmed know-how in Arctic fields — Premium Port hydraulic fracturing (fracking) — is getting used to reinforce oil restoration, having been initially examined in growing the Novoportovskoye subject in 2016. Premium Port hydraulic fracturing is a know-how involving full-bore sliding sleeves. This tools enhances hydrocarbon restoration by exponentially rising the fracture contact space, controlling the fracture initiation website, and its extent and conductivity.
The growth of the northern a part of the Novoportovskoye subject was initiated in 2016 in the course of the enlargement of current field-production infrastructure, with a view to growing new oil deposits inside the current license block.
Sergey Dotor, head of the Production Directorate stated: “Novy Port is the flagship in Gazprom Neft’s growth of the Arctic. The ‘Arctic Gates’ terminal was launched right here in 2016, making it potential to start out delivery oil by means of the Northern Sea Route, bettering the viability of the Arctic mission. A brand new and impressive job is now being addressed in these northern latitudes — managing oil manufacturing within the northern a part of an asset some appreciable distance from key Novoportovskoye subject infrastructure. This is a significant step ahead in implementing this mission, and one which calls for utilizing cutting-edge applied sciences and discovering new options.”
(Source and picture: Gazprom Neft – Novy Port facility and loading website)

The publish GAZPROM NEFT BEGINS FULL-SCALE DEVELOPMENT OF NOVOPORTOVSKOYE FIELD appeared first on Energy Global News.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here