Development drilling is drawing to a detailed at Premier Oil’s Catcher space challenge within the UK central North Sea.

Earlier this month the Burgman discipline manufacturing wells got here onstream, so all three space fields (Catcher, Varadero, and Burgman) are actually delivering hydrocarbons.

Initial dynamic information signifies good stress help and connectivity inside the reservoirs, whereas supply capability of the accessible wells has been excessive with mixed manufacturing capability nicely above the FPSO’s plant design.

@medicalInsuranceWidget@

To date, 5 produced oil cargoes have been offloaded and offered to 4 completely different patrons.

Premier added that total outcomes have exceeded its pre-drill estimates with the most recent Catcher growth nicely encountering extra oil-bearing sands than initially anticipated, and higher reservoir high quality.

Elsewhere on this sector, the corporate is contemplating changing an out of date manufacturing nicely right into a water injector to enhance restoration from the Huntington discipline.

In addition, it’s in talks with Teekay on extending the lease of the round Sevan-designed FPSO past April 2019.

Premier anticipates sanction for its Tolmount gasoline challenge within the southern North Sea later this 12 months, adopted by first gasoline in 4Q 2020.

This summer time the corporate plans to accumulate high-resolution 3D seismic over the Greater Tolmount Area upfront of drilling the Tolmount East appraisal nicely in 2019.

Source: www.offshore-mag.com

Please depart feedback and suggestions beneath

hey

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here