A Russian pipe-laying vessel has stopped close to the development website of the Gazprom-led Nord Stream 2 fuel pipeline within the Baltic Sea.

According to a Reuters article, AIS information from Saturday places the Akademik Cherskiy pipelayer close to the Nord Stream 2 development website. The Russian pipe-laying vessel has stopped north of Poland and Germany.

Gas big Gazprom acknowledged lately that it will resume pipe-laying work on the stalled 2.6-kilometre half earlier than the top of 2020. At the time the Russian firm didn’t disclose which vessel can be conducting the work.

Work on the pipeline was halted final December when
pipe-laying firm Allseas suspended operations after U.S. sanctions focused
firms offering vessels to put the pipes.

The potential resumption of exercise comes after outgoing
U.S. President Donald Trump, whose administration has staunchly opposed the
pipeline, misplaced to president-elect Joe Biden within the presidential election
earlier this month.

Posted: 11 months ago


Allseas stops Nord Stream 2 works citing U.S. sanctions

Categories:

  • Project & Tenders
Posted: 11 months in the past

The media outlet additionally acknowledged that the U.S. ambassador to
Berlin referred to as on the German authorities and the European Union to place a
non permanent halt to development work on the pipeline to ship a sign to Moscow.

The pipeline, which Washington says compromises European
vitality safety, has develop into a serious bone of rivalry between Russia and the
West and the relations between the 2 sunk to post-Cold War lows.

This pipeline isn’t just an financial mission, however the Kremlin’s political software to bypass Ukraine and divide Europe“, Robin Quinville, performing U.S. ambassador to Berlin, informed Germany’s Handelsblatt every day.

It is value noting that the maritime authority within the German
metropolis of Stralsund did inform shippers that there shall be pipeline-laying
actions from 5-31 December within the Baltic Sea space the place Nord Stream 2 will
make landfall.

The $11 billion Nord Stream 2 mission, led by Russian state
vitality firm Gazprom and aimed toward doubling the prevailing Nord Stream
pipeline’s capability, is greater than 90 per cent full. There are 5 different
companions within the mission – Uniper, Wintershall Dea, Shell, OMV, and Engie.

However, the annual U.S. defence coverage invoice unveiled by lawmakers late final Thursday accommodates sanctions that backers say will halt Nord Stream 2.

Although the development of the 1,230-kilometre pipeline is
almost completed, the small part in Germany at the moment beneath rivalry wants
to be accomplished in addition to the ultimate stretch of about 120 kilometres in Danish
waters.

The mission is designed as two parallel 48-inch strains,
roughly 1,200 kilometres lengthy, every beginning southwest of St. Petersburg and
ending at German coast, Greifswald. It is designed to spice up the quantity of
Russian fuel that may be shipped to Europe with out having to undergo Ukraine.

The fuel pipelines can have the capability to move 55
billion cubic meters (bcm) of Russian fuel a 12 months to the EU, for a minimum of 50
years.

The put up Russian pipe-layer stops close to Nord Stream 2 pipeline website appeared first on Offshore Energy.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here