TechnipFMC vessel Skandi Niterói lately wrapped up the set up marketing campaign of Peregrino Phase II for Equinor in Brazil.

It is a part of the corporate’s engineering, procurement, building and set up (EPCI) contract secured in September 2017.

The offshore marketing campaign was carried out effectively, with no accidents and concurrently with different operations on the Peregrino discipline.

This included the set up of a brand new fastened platform and oil manufacturing actions.

In addition to the set up actions which started in October 2019, the Skandi Niterói carried out a number of subsea building operation.

They included disconnection/connection of present traces and connection of latest ones.

Fernando Fontes, director of the Peregrino Phase II undertaking, mentioned:

“Carrying out folks and supplies logistics within the midst of a pandemic required particular and extra care to make sure everybody’s well being and security.

“All of this was solely doable due to the exhausting work of each undertaking’s groups – TechnipFMC and Equinor.”

Peregrino is Equinor’s largest heavy oil discipline outdoors Norway.

The discipline locates 85 kilometres off the coast of Rio de Janeiro, within the south-west a part of the Campos Basin.

Peregrino discipline operator is Equinor with a 60 per cent share, additionally in partnership with the Chinese firm Sinochem (40 per cent curiosity).

The submit TechnipFMC delivers Peregrino II set up marketing campaign appeared first on Offshore Energy.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here