Wintershall Dea has begun drilling 4 manufacturing wells on the Dvalin gasoline area within the Norwegian Sea, preparing for the beginning of manufacturing in 2020. Drilling of the manufacturing wells from the Transocean Arctic rig is predicted to final roughly one 12 months and follows an intense summer time of exercise across the Wintershall Dea operated Dvalin growth. The Dvalin area will strengthen Wintershall Dea’s place as one of many largest gasoline exporters from Norway.

@hotTipThousandsOfRecruiters@

“Dvalin matches neatly into our technique of supplying gasoline to the European market by means of fields and pipelines whereas making certain we stay some of the essential gasoline producers on the Norwegian Continental Shelf. It additional demonstrates our capabilities as an environment friendly and succesful operator,” stated Alv Solheim, managing director of Wintershall Dea in Norway.

Since April, exercise on the Dvalin area has included set up of pipelines and a manifold at 400 meters water depth. In August, a three,500 ton processing module was accomplished and lifted on to the close by Heidrun platform in preparation for receiving gasoline from the Dvalin area. The area is situated 259 kilometers north of Kristiansund in mid Norway.

“A summer time of exercise topped off with the beginning of drilling on the important thing Dvalin venture is a potent signal of the idea we’ve got in Norway, and the sources we’re ready to speculate to achieve our ambitions. The Dvalin workforce has labored tirelessly from day one to ship a clean, well timed, and most of all protected venture so far”, stated Hugo Dijkgraaf, Wintershall Dea chief know-how officer.

Dvalin is being developed as a subsea area tied again to Heidrun, which lies some 15 kilometers to the northwest. The 4 wells might be drilled to a depth of round four,500 meters.

The design philosophy for the wells has centered strongly on HSEQ, in step with the entire Dvalin venture so far. The drilling workforce goals to take care of the venture document of getting no critical incidents.

About Dvalin

The Dvalin gasoline area within the Norwegian Sea is being developed with 4 subsea wells, tied again to the Equinor operated Heidrun host platform. The gasoline from Dvalin might be transported to the Heidrun platform by way of a 15 km pipeline. From there, it will likely be despatched to the Polarled gasoline transportation system by way of a 7.5 km pipeline, earlier than it will likely be additional processed to dry gasoline on the Nyhamna onshore gasoline terminal. Finally, the gasoline might be transported by way of Gassled to the market.

  • Partnership: Wintershall Dea (operator 55%), Petoro (35%), Edison (10%)
  • Location: 259 km north of Kristiansund on the West coast of Norway, 15 km northwest of the Heidrun area and 35 km south of the Skarv area within the Norwegian Sea.
  • Water depth: 400 meters
  • Estimated reserves: 113.three MMboe

Development resolution: A four-slot template has been put in on the seabed. Flow-lines and umbilical might be related to the Heidrun platform, 15 km northwest of the Dvalin area. On the Heidrun platform, two modules, one 400 ton utility module and one three,500 ton gasoline processing and compression module, have been put in.

As the third largest non-state operator on the Norwegian Continental Shelf with a every day manufacturing of round 150,000 bopd, Wintershall Dea is aiming to additional enhance these volumes over the following years.

Wintershall Dea is owned by BASF (67 %) and LetterOne (33%). An preliminary public providing is envisaged within the medium time period.

Source: www.worldoil.com

Please go away feedback and suggestions under

hi there

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here