Duke Energy will enhance the reactor capability at its Oconee Nuclear Station by about 42 MW.

The U.S. Nuclear Regulatory Commission accepted the ability uprate request for Units 1, 2 and three at Oconee in South Carolina. Duke will enhance every reactor’s warmth output and energy uprate in a phased method based mostly on refueling schedules.

Unit 1 at present has a capability of about 909 MW, whereas Units 2 and three prime out at near 919 and 922 MW, respectively. Each unit would acquire roughly 14 MW, based on the report.

See our protection of the nuclear energy business

Subscribe to PE’s free, weekly publication

The NRC’s security analysis of the plant’s proposed energy uprate centered on a number of areas, together with the nuclear steam provide programs, instrumentation and management programs, electrical programs, accident evaluations, radiological penalties, hearth safety, operations and coaching, testing, and technical specification adjustments. The NRC revealed a Federal Register discover relating to the Oconee energy uprate utility in June 2020.

Oconee Units 1-Three have been all constructed and commissioned between 1973 and 1974. Babcock & Wilcox equipped the pressurized water reactors.

The plant’s annual web technology output averages round 22,000 GWh per yr, based on studies. Its working licenses expire within the 2030s.

— — — — —

Asset Management for Plant Life Extension will probably be a session February 18 within the POWERGEN+ collection. Click right here for extra details about that session and to register free of charge. Participants embody specialists from Sargent & Lundy, Babcock & Wilcox and ENERCON Services.

The put up NRC approves 14-MW uprate in any respect three Duke Oconee nuclear reactor models appeared first on Power Engineering.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here