The Danish wind turbine producer Vestas has obtained an order to produce EnVentus generators to the 102 MW Närpiö Norrskogen challenge, being developed by EPV Energy Ltd in western Finland.
Vestas will provide, set up and fee 17 V162-6.0MW generators on the challenge, which is positioned in Närpiö, close to Vaasa on the western coast of Finland. The order pushes uptake of the EnVentus platform to over three GW, with roughly 1.three GW of these orders positioned in Finland. EPV Energy and Vestas have collaborated on a number of different wind initiatives in Finland, with over 365 MW put in together with the 124 MW Teuva Paskoonharju challenge at the moment in execution.
At Närpiö Norrskogen, Vestas will present service via a long-term Active Output Management 5000 (AOM 5000) service settlement of greater than 30 years, offering energy efficiency certainty and Vestas’ industry-leading service experience all through the lifetime of the challenge.
The firm has secured orders from DIF Capital Partners for 4 initiatives in Poland, all awarded in Poland’s second public sale spherical from 2019, cumulatively totalling 108 MW in capability.
The 4 initiatives are Pruszcz (70 MW), Markowice (26 MW), Piaski (eight MW) and Wyszki (four MW). The Pruszcz and Markowice initiatives are positioned in Kujawsko-Pomorskie Voivodeship, whereas the Piaski and Wyszki initiatives are located in Wielkopolskie Voivodeship.
Across the 4 initiatives Vestas will provide and set up 52 V100-2.zero MW generators, in addition to two V90-2.zero MW generators. These orders construct on the greater than 2.6 GW of put in wind capability that Vestas has already delivered in Poland.
Vestas will present service for the initiatives via 20-year Active Output Management 4000 (AOM 4000) service agreements, offering energy efficiency certainty and Vestas’ industry-leading service experience all through the lifetime of the initiatives.
In India Vestas has secured a 101 MW order from ReNew Power. The order is an extension of ReNew’s present challenge in Kutch, Gujarat, the place Vestas had beforehand provided generators totalling to 250 MW. Vestas has additionally provided generators of 100 MW to a different certainly one of ReNew’s initiatives in Taralkatti, Karnataka.
The contract contains provide and supervision of 46 V120-2.2 MW generators in addition to a 10-year Active Output Management (AOM) 5000 service settlement, designed to maximise power manufacturing for the challenge. With a yield-based availability assure, Vestas will present ReNew Power with (long-term) enterprise case certainty.
All the initiatives totalling 311 MW are anticipated to be accomplished by the top of 2022.
(Source: Vestas – Image: Kutch wind farm in Gujarat, India/PES)

The submit VESTAS SECURES 300 MW ORDER FROM WIND PROJECTS IN FINLAND, POLAND AND INDIA appeared first on Energy Global News.

Read more at Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here